Borough of Mountain Lakes

Lakes Management Advisory Committee Issues March 2004

 

The manager discussed budget items. 

            — Able to put funding back for goose control beyond egg addling.

            — Able to continue testing for key water quality data.

            — Still have about $8,000 for cleaning, focused on the Canal.

— Discussion of directing the Committee's annual walk towards reviewing the two new dams.

— Discussion of storm water management plan mandate from the State, problems with getting vacuum/jet truck time from neighboring towns this year. 

— The Manager is planning to buy vacuum/jet vehicle to replace existing 25 year-old sewer line jet vehicle. 

            — The new vehicle would be able to handle both sanitary and storm sewers.  This will lead to increased frequency of cleaning.

 

Allied Biological raised the following:

— There have been some delays in the State permitting process.  Likely no impact on Mountain Lakes

— Discussion of alum treatment for 2004.  The following is a link to a Wisconsin Department of Natural Resources document dealing with alum treatments. http://www.dnr.state.wi.us/org/water/fhp/papers/alum_brochure.pdf

— Discussion of sonic devices to kill algae.

— Discussion of the EPA plant "hitchhiker" document and the importance of washing boats between lakes to prevent the spread of non-native plants and animals.    See the document: http://www.epa.gov/owow/lakes/month/pdf/hitch_press.pdf

 

Neither Allied Biological nor the Borough endorses any Web site listed here.  Links are provided solely as examples of information available on the Web.